Final report on 2013 water projects

 Final Report on Water Projects in Ejere District, 2013. Since 2004, For-ethiopia have completed 15 water projects. Four springs have been capped, five hand dug wells and six drilled wells providing clean water to over 15,000 people. [slickr-flickr...

Water to 10,000 people

Thanks to a generous donation six wells were drilled in Ejere District, West Shewa Zone, Ethiopia in 2011. The six sites were evaluated by water engineer Dr Ken Edworthy with the help of the British Consultancy Charitable Trust (BCCT). Ken visited all the sites and...

Arada Well (2007)

[pdf-ppt-viewer href=”https://for-ethiopia.com/wp-content/uploads/2011/01/W1.pdf” width=”600″ height=”700″]